← All work

Design OPS. Design Sprint

A workshop and presentation for my design and engineering teams on how to work better together.

My role
I designed and ran the workshop and presentation for the design and engineering teams.
Key decision
Combined Agile development and Design Sprints in one shared framework, instead of running them as separate processes.
Result
A shared way of working for both teams, documented in the presentation below.
Design OPS and Design Sprint
  • Problem

  • Design and engineering worked in disconnected cycles, prototyping was slow, and user feedback arrived late.
  • Approach

  • A five-phase sprint (Understand, Diverge, Converge, Prototype, Test) running inside the regular Agile sprints.

Full presentation on Agile teams and design sprint facilitation.

Download presentation
← All work